Pipefitter’s Mate
Support
Help with calculations, fabrication layouts, saved spools and exports.
Before fabrication
- Check the selected units, NPS, schedule and fitting geometry.
- Confirm stock length and root-gap settings.
- Review every generated cut length and drawing against the project specification.
- Use qualified fabrication procedures and site safety controls.
Report a problem
Include the calculator used, input dimensions, selected pipe data, app version and a screenshot where possible. Do not include private project or payment information.
Email Pipefitter’s Mate support
Privacy
Read the Pipefitter’s Mate privacy policy.